The basic power network types are illustrated in DIN VDE 0100-100 (VDE 0100-100):2009-06 In 131.1 of this standard, reference is made to the fact that, with these requirements, the safety of persons, livestock and property is provided against dangers and damage, provided that electrical systems are used in the intended manner. The risks involved include the occurrence of dangerous shock currents and interruptions in the power supply.
The IT system is described in IEC 60364-1:2005-11, 312.2.3 (AC) and 312.2.4.5 (DC). The definition states that all active components must be isolated from earth or that one point must be connected to earth via an impedance. The exposed-conductive-parts (of electrical equipment items) on the electrical system are either earthed individually, in groups or collectively with the system's earth (also refer to IEC 60364-4-41:2017-03, 411.6). The system may also be connected to earth via a sufficiently high impedance. In Germany, this is only applied for measurement or functional purposes.
A distinction must be made between the power source for a "normal" IT system and for a medical IT system. Disconnection in the form of basic insulation is required for the power source. In practice, this usually takes the form of an isolating transformer. This function can also be performed by a battery, by a standalone photovoltaic (PV) system or by a mobile power generator. In a medical IT system, the leakage currents during intracardial interventions (e.g. open-heart surgery) must be extremely low given the potential risk to the patient. The required isolating transformer is described in IEC 61558-2-15:2011-11.
In practice, the IT system is frequently known as "the unearthed power supply system". "Unearthed" in this context only refers to the connection between all active conductors and the earthing system. In accordance with IEC 60364-4-41:2017-03, 411.3.1.1 "Protective earthing", the exposed-conductive-parts must be connected to a protective conductor, depending on the type of earth connection. What this means for the IT system in accordance with 411.6.2 is that the bodies must be earthed individually, in groups or collectively and that the following conditions must be satisfied:
In alternating current systems RA × Id ≤ 50 V
Where
RA is the sum of the resistance in Ω of the earth electrode and the protective conductor for the respective exposed-conductive-parts;
Id the fault current in A of the first fault with negligible impedance between a line conductor and an exposed-conductive-part.
No touch voltage limitation is considered in d.c. systems as the value of Id can be considered to be negligibly low.
The fault current Id following the occurrence of a first fault against an exposed-conductive-part or earth is very low, and automatic shutdown is not necessary (IEC 60364-4-41:2017-03, 411.6.1), presupposing that the earthing requirement defined in Section 411.6.2 has been satisfied. This means that the protective conductor resistance RA is parallel to the body resistance and that the already very low fault current flows through this protective conductor and that the touch voltage remains significantly below the maximum permitted value of 50 V in AC systems. This is of particular benefit in the medical sector.
The value of fault current Id at a first fault is determined by the nominal voltage, nominal frequency and the parallel circuit comprising the system leakage capacitance and insulation resistance of the electrical system to earth. The fault current, in the event of a first fault, flows with negligible impedance between a line conductor and an exposed-conductive-part. With a good level of insulation in an electrical system, Id can be approximated by the system leakage capacitance and can be calculated as follows:
For a 3-phase system
ICe = U⁄√3 ×3ω × Ce = U ×√3×ω ×Ce
For single-phase system
ICe = U × ω × Ce
IEC 60364-4-41:2017-03, 411.6.3 states that the following monitoring and protective devices can be used in IT systems:
Subclause 411.6.3.1 defines that an insulation monitoring device (IMD) is required to report a first fault between a live part and an exposed-conductive-part or to earth. This device must issue an audible and/or visible signal that must last for as long as the insulation fault exists. It is advisable that a first fault is remedied as fast as practically feasible. "As fast as practically feasible" depends on the practical parameters relating to the system. Fundamentally, the IT system has a significant advantage in that an insulation fault does not have to be eliminated immediately but can instead by delayed, e.g., until the next maintenance interval for the system is due.
With an insulation fault locating system (IFLS), faulty outputs and/or devices can be located during operation, i.e. there is no need to shut down the system. For troubleshooting purposes, measuring pulses are superimposed on the IT system that are in turn picked up and evaluated by measuring current transformers. Based on the assignment of the measuring current transformer/output, it is then easy to identify the faulty output.
The configuration of overcurrent protective devices takes due account of the contents of IEC 60364-4-43:2008. For IT systems, the following points must be taken into account:
In acc. with IEC 60364-4-41:2017-03 subclause 411.3.3, additional protection must be provided in AC voltage systems in the form of fault current protective devices (RCDs) for < 32 A sockets that are intended for use by non-specialists and for general use. However, this requirement is not practicable in allowing RCDs to achieve the desired protective action in IT systems. For a start, the operating principle of an RCD after a first fault requires a fault current Id that must be above the rated fault current IΔn of an RCD (e.g. > 30 mA). However, in practice, this is not the case. Even two independent insulation faults at both live conductors or connected equipment items do not cause an RCD to trip because these two faults act like a load.
In addition, IEC 60364-4-41:2017-03, states that additional protection for socket-outlet circuits using RCDs with IΔn < 30 mA is also required for IT systems if a fault current Id > 15 mA flows in the event of a first fault. On closer inspection, however, it becomes apparent that this requirement is technically questionable:
The primary objective governing IT systems is that they should not shut down unexpectedly when an initial fault occurs. There is therefore no point in using electric arc protective devices for final circuits up to 16 A in IT systems. This is also the subject of the latest DKE announcement in Germany in November 2017. This includes the following provisions:
An insulation monitoring device is selected on the basis of the following criteria:
To simplify the process of selecting insulation monitoring devices for the planner and user, the product standard for insulation monitoring devices, IEC 61557-8:2014/CORI:2016 includes further stipulations:
Important notes for the project planning of IT systems can be found in subclause 538.3 of DIN VDE 0100-530 (VDE 0100-530):2011-061) "Selection and erection of electrical equipment– Isolation, switching and control". IMDs must comply with IEC 61557-8: 2014
The response value must be set appropriately for the affected system. In accordance with the German standard subclause 538.1.3, a value of 100 Ω/V and, for prewarning, a value of 300 Ohm/V is recommended. In the previous edition of the standard, a guide value of 50 Ω/V is recommended. Both parameters are correct in principle and are influenced by the number of consumers and by the quality of the installation (e.g., humidity, dust etc.). In practice, the value displayed on the screen of the IMD is used to set an alarm value that is less than this displayed value, and that therefore represents the desired minimum value, leaving sufficient latitude for service and maintenance work. Also bear in mind here that all important system outputs are also in operation.
However, another advantage is that any significant change to the insulation resistance by switching on or off a load or system component is displayed by the IMD, enabling potential weaknesses to be identified.
In accordance with VDE 0100-530 (VDE 0100-530):2011-06, subclause 538.3, an insulation monitoring device in TN, TT and IT systems can be used to monitor circuits that are switched off. This can, for example, include motorised winches, elevators and slide valve drives. This requires that the monitored electrical circuits are isolated from all poles of the system.
In accordance with IEC 60364-4-41:2017-03, subclause 411.6.4, after an initial fault occurs, the conditions for an automatic disconnection following a second fault occurring on a different live conductor must be satisfied. In practical terms, this means that a defined level of loop impedance must be achieved. For IT systems without a neutral conductor, the loop impedance is defined as:
ZS ≤ U/(2 × Ia )
Where:
U = Nominal AC voltage between the line conductors
Ia = Current (in A) that causes a protective device to be triggered within a time period defined in subclauses 411.3.2.2 / 411.3.2.3.
If for reasons of availability, if the system is not intended to shut down when an initial fault occurs, ensure that the prevailing fault current Id is < 0.4 IΔn when using RCDs. For a 30 mA RCD this means that Id is < 12 mA.
Additionally, it should be stated that symmetrical faults on different live conductors should never cause a fault current that causes a system to shut down.
An RCD can be used for each consumable if and only if the shutdown conditions for overcurrent protection cannot be satisfied, because for example:
IEC 60364-4-43:2008-08 subclause 431.2.2 includes a comment to the effect that it advisable not to route an N conductor in IT systems. This should be taken into account whenever single-phase loads are also connected to a 3-phase/N IT system. If an insulation fault occurs in L1, the voltage on conductors L2/L3 to earth is increased to the phase-to-phase voltage, e.g., 400 V. This could damage suppression capacitors that are switched to earth. Ensure that the voltage offset only affects the voltage to earth. No voltage offset between active conductors arises. Single-phase equipment must be configured appropriately, i.e., they must be suitable for operation in 3-phase /N systems. In practice, two separate IT systems are frequently set up, one for single-phase loads and one for 3-phase loads.
At this point, a comment on the generally applicable comment from IEC 60364-4-43:2008-08 sub-clause 433.3.3, that overload protective devices can be omitted if an unexpected disconnection of the circuit constitutes a source of risk. In such cases, an overload alarm should be considered.
IT systems are always of greatest benefit when they protect against the disconnection of the power supply in the event of a first fault. The fundamental basis for fault-free and safe operation comprises setting the system up in accordance with the standards and the correct choice of protective and monitoring devices.
Hofheinz, Wolfgang - Protection technology with insulation monitoring, VDE-Verlag GmbH, Berlin
DIN VDE 0100-100 VDE 0100-100:2009-06
IEC 60364-1:2005-11
Low-voltage electrical installations
Part 1: Fundamental principles, assessment of general characteristics, definitions
IEC 60364-4-41:2017-03
Low-voltage electrical installations
Part 4-41: Protective measures - Protection against electrical shock
IEC 60364-4-42:2010/AMD1 2014
Low-voltage electrical installations
Part 4-42: Protective measures - Protection against thermal effects
IEC 60364-4-43:2008-08
Low-voltage electrical installations
Part 4-43: Protective measures - Protection against overcurrent
IEC 60364-7-710:2002-11
Electrical installations of buildings
Part 7-710: Requirements for special installations or locations - Medical locations
DIN EN 61557-8:2014-12
Electrical safety in low voltage distribution systems up to 1 000 V a.c. and 1 500 V d.c. – Equipment for testing, measuring or monitoring of protective measures
Part 8: Insulation monitoring devices for IT systems
IEC 61557-9: 2014-12
Electrical safety in low voltage distribution systems up to 1 000 V a.c. and 1 500 V d.c. – Equipment for testing, measuring or monitoring of protective measures
Part 9: Equipment for insulation fault location in IT systems
DIN VDE 0100-530 (VDE 0100-530):2018-06
Errichten von Niederspannungsanlagen
Teil 530: Auswahl und Errichtung elektrischer Betriebsmittel – Schalt- und Steuergeräte
Standards can be obtained from VDE-Verlag [publishers] or Beuth.
Name | Category | Size | Language | Timestamp | D-/B-Number |
---|---|---|---|---|---|
Product Overview ISOMETER®/ISOSCAN® | Product Overviews | 5.3 MB | EN | 2024/02/1616.02.2024 | |
Why the IT System is Often the Best Choice for Power Supply Systems of All Types | Technical article | 3.0 MB | EN | 2019/07/1111.07.2019 | |
Initial and Periodic Verification of IT Systems | Technical article | 621.5 KB | EN | 2020/03/0202.03.2020 | |
High Availability for Reliable Operation in Waste Water Treatment Facilities | Technical article | 601.8 KB | EN | 2019/05/1313.05.2019 | |
IT System Ensures Electrical Safety at the Munich Airport | Technical article | 284.0 KB | EN | 2019/05/1313.05.2019 | |
The Stone Age Meets Modern Network Protection Technology | Technical article | 338.5 KB | EN | 2019/05/1313.05.2019 | |
The Largest Photovoltaic System in Latin America | Technical article | 447.8 KB | EN | 2019/05/1313.05.2019 |
Products
Insulation monitoring device for inverter applications and large industrial plants
Insulation fault locator for localisation of insulation faults in main circuits
Insulation monitoring device for inverter applications and large industrial plants
Insulation fault locator for localisation of insulation faults in main circuits